  • Interior work ramped up on Level 1, with insulation and drywall installation underway.
  • Curbs around the building are being demoed and replaced, prepping for smoother transitions and finishesโ€‹.
  • Overhead doors received slab pour-backs, prepping for equipment installation.

What’s Coming Up

  • Steel framing for rooftop units (RTUs) will be installedโ€”another big step in powering the new space.
  • New office fire sprinkler system will be demoed and replaced on Level 2.
  • Framing for rooftop mechanical units will start, a key step in supporting the buildingโ€™s HVAC systems.

Why This Matters

The building is on track for panel erection in early April, and each step brings us closer to realizing a bigger, more capable home for the Frazer Family. As always, weโ€™re grateful for the teamwork and coordination happening behind the scenes to make this project a success.