Tap To Call
Defining the Future of Mobile Healthcare™
By: Frazer on April 28, 2025

Progress on the Production War Room | Building Update – Episode #10

New Production Facility

What’s Been Happening

  • Interior work ramped up on Level 1, with insulation and drywall installation underway.
  • Curbs around the building are being demoed and replaced, prepping for smoother transitions and finishes​.
  • Overhead doors received slab pour-backs, prepping for equipment installation.

What’s Coming Up

  • Steel framing for rooftop units (RTUs) will be installed—another big step in powering the new space.
  • New office fire sprinkler system will be demoed and replaced on Level 2.
  • Framing for rooftop mechanical units will start, a key step in supporting the building’s HVAC systems.

Why This Matters

The building is on track for panel erection in early April, and each step brings us closer to realizing a bigger, more capable home for the Frazer Family. As always, we’re grateful for the teamwork and coordination happening behind the scenes to make this project a success.

Thanks for following along—more updates to come!

#BehindTheScenes #FrazerExpansion #BuildingTheFuture

Share This Page
Facebook
Instagram
LinkedIn
Twitter
YouTube