What’s Been Happening
- The tilt-wall panels were successfully erected, giving full definition to the structure’s footprint and layout.
- Structural steel erection is now underway, forming the framework that will support the building’s systems and layout.
- Work continued on fire sprinkler system installation on both levels.
What’s Coming Up
- Demo and install new office sprinkler system
- Metal decking installation
- Ceiling grid installation
Why This Matters
With the building structure now fully visible and interior systems taking shape, the Frazer expansion has officially entered a transformative phase. These structural milestones pave the way for the functional and visual details that will define the new space.
Thanks for following along as we continue building a better, more capable future for Frazer.
#BehindTheScenes #FrazerExpansion #BuildingTheFuture